No. 04Oct 2026
Just above cut-off: how certain is the ore/waste decision?
In this four-case example, a parcel estimated at 1.02 g/t has only a 50 % chance of being above its 1.00 g/t cut‑off, and processing it is still the better call. The estimate, the chance of being ore and the expected margin are three different numbers.
-
No. 03Oct 2026
The stope volume matches the design. Can dilution and ore loss still be high?
The surveyed void matched the planned 10,000 m³ while 10 % of the planned ore stayed in the footwall and hanging-wall waste took its place. Report three volumes, not the net.
-
No. 02Oct 2026
Can truck productivity improve while every haul route gets worse?
Reported fleet productivity rose 15.7 % while both haul routes fell 10 %: the trucks spent more of their hours on the short haul. Compare on a fixed route mix before crediting the change.