Drilling, blasting, loading and hauling, open pit or underground, up to the run-of-mine pad. 3 entries in the Core Log.

  1. No. 04Oct 2026

    Just above cut-off: how certain is the ore/waste decision?

    In this four-case example, a parcel estimated at 1.02 g/t has only a 50 % chance of being above its 1.00 g/t cut‑off, and processing it is still the better call. The estimate, the chance of being ore and the expected margin are three different numbers.

  2. No. 03Oct 2026

    The stope volume matches the design. Can dilution and ore loss still be high?

    The surveyed void matched the planned 10,000 m³ while 10 % of the planned ore stayed in the footwall and hanging-wall waste took its place. Report three volumes, not the net.

  3. No. 02Oct 2026

    Can truck productivity improve while every haul route gets worse?

    Reported fleet productivity rose 15.7 % while both haul routes fell 10 %: the trucks spent more of their hours on the short haul. Compare on a fixed route mix before crediting the change.