eleticle
Tag · Process area

Maintenance and reliability

Keeping equipment running: condition, failures, work orders and planned maintenance. 2 entries in the Core Log.

  1. No. 16Nov 2026

    Does searching a site’s own work orders help a local LLM as much as a glossary?

    The same local LLM read No. 13's 300 held-out mining work orders with ten of the company's other work orders, found for each by an offline SAG-Wiki search, in place of a 50-line glossary. Meaning came through in 290 notes with the search, 273 with the glossary run the same day (22 against 5 kept by only one) and 283 in No. 13's glossary run.

  2. No. 13Nov 2026

    Does a site glossary help a local LLM read maintenance work orders?

    Each of three mining companies had a 50-line glossary built from 3,200 of its own notes. Across 300 held-out work orders containing shorthand, a local LLM kept the meaning of 283 with the company's glossary, against 228 without it, and neither version said work was done that the note did not report.